definePlaywrightDrupalConfig() asks for cpus - 2 workers, so a single suite already claims nearly the whole machine. That is the right default for the common case — one developer, one checkout, one run at a time — and it is the wrong default the moment two runs overlap.

Overlap is easy to arrange without noticing. Each git worktree is normally its own DDEV project, CI-style scripts get run by hand, and coding agents will happily start a suite in one worktree while another is still going. Neither run can see the other, so both keep asking for cpus - 2 workers on a machine that has one set of CPUs. Two suites at once do not each take half the time; they take longer than running them back to back, and they starve each other badly enough to fail visual comparisons that have nothing wrong with them.

There are two ways to deal with this, and they solve different problems.

Dialing Down a Single Run

PLAYWRIGHT_WORKERS overrides the worker count for one invocation:

PLAYWRIGHT_WORKERS=4 ddev task playwright:run

It accepts a positive integer or a percentage, matching Playwright's own workers option:

PLAYWRIGHT_WORKERS=50% ddev task playwright:run

This is the tool for "I know something else is using this machine right now." It deliberately takes precedence over a workers value passed to definePlaywrightDrupalConfig(), because the point is to adjust a run without editing a config file that is shared and committed. Playwright's own --workers flag still wins over both.

An unusable value — PLAYWRIGHT_WORKERS=lots, PLAYWRIGHT_WORKERS=0 — raises an error rather than falling back to the default. Silently running a whole suite at the wrong parallelism is worse than refusing to start.

Serialising Runs Across the Machine

PLAYWRIGHT_WORKERS still relies on somebody knowing to set it. The mutex removes that requirement: with it enabled, one Playwright run happens at a time across every DDEV project on the machine, and the second one is told so.

It is off by default. Turn it on by setting PLAYWRIGHT_MUTEX=1 in the web container's environment — most easily in .ddev/config.yaml:

web_environment:
  - PLAYWRIGHT_MUTEX=1

or .ddev/config.local.yaml if you would rather it stay out of git. Run ddev restart afterwards.

playwright:run, playwright:visualdiff and playwright:regenerate then take the lock for the whole of their work, playwright:install included — rebuilding the test site is itself expensive enough to be worth serialising.

What Happens When the Lock Is Taken

The default is to queue, waiting up to 30 minutes:

$ ddev task playwright:visualdiff
playwright-mutex: another Playwright run is held by project 'my-site-review' for 6m (started 2026-08-20 09:12:44).
playwright-mutex: waiting up to 1800s for it to finish.

Set PLAYWRIGHT_MUTEX_WAIT to change that number of seconds, or PLAYWRIGHT_MUTEX_FAIL_FAST=1 to be refused immediately instead. Refusing is the better choice when the caller has something else it could be doing — notably a coding agent, which would otherwise sit in a queue for half an hour.

A refusal exits 75 (EX_TEMPFAIL), which no Playwright exit status uses, so "busy" is never mistaken for "tests failed". Nothing has run at that point: wait for the other suite and issue the same command again.

Exit codes through task

Task reports a failing task as exit status 201 regardless of what the command returned. To see the 75 — or Playwright's own exit code — pass -x: ddev task -x playwright:run. The message on stderr identifies a mutex refusal either way.

Where the Lock Lives

The lock file is on ddev-global-cache, the Docker named volume DDEV mounts into every project's web container at /mnt/ddev-global-cache. That is one inode on the host, so flock(2) is honoured across containers. Nothing needs adding to docker-compose, and no project needs restarting for another project's lock to apply to it.

The kernel releases the lock however the holder dies — cleanly, killed, or with the container stopped underneath it — so there is never a stale lock to clear by hand.

If the volume is not mounted, the mutex prints a warning and runs anyway. There is nothing to contend with outside DDEV, and a lock that cannot be taken must not stop anyone running their tests.

CI

The mutex is skipped whenever CI is set, even with PLAYWRIGHT_MUTEX=1. Hosted runners get a machine each, sharded runs (playwright:run shard=1/3) are supposed to overlap, and several jobs on one self-hosted runner share a Docker daemon — and therefore this volume — so a lock there would turn a correct parallel build into a queue or a pile of failures.

PLAYWRIGHT_MUTEX=force overrides this for the rare CI machine that really does need serialising.

Reference

Variable Default Effect
PLAYWRIGHT_MUTEX unset 1 enables the lock; force enables it on CI too; anything else runs unchanged
PLAYWRIGHT_MUTEX_WAIT 1800 Seconds to wait for the lock before giving up
PLAYWRIGHT_MUTEX_FAIL_FAST unset 1 refuses immediately instead of waiting
PLAYWRIGHT_MUTEX_DIR /mnt/ddev-global-cache/playwright Where the lock file lives

Wrapping Your Own Commands

The mutex is a plain wrapper, published as the playwright-drupal-mutex bin, so anything else competing for the same CPUs can take the same lock. npx resolves it from test/playwright/node_modules/.bin:

  fixtures:refresh:
    dir: test/playwright
    cmds:
      # A long database import that then warms the site should queue rather
      # than be thrown away half an hour in, so give it a long wait.
      - PLAYWRIGHT_MUTEX_WAIT=3600 npx playwright-drupal-mutex npx playwright test --ignore-snapshots

Nested invocations pass straight through: the wrapper exports PLAYWRIGHT_MUTEX_HELD=1 for the command it runs, so a locked task that calls another locked task does not block against a lock its own process tree holds.

Refusing a Run Before It Starts

The mutex is checked when a task starts, which for playwright:run is after playwright:install has rebuilt the test site. A coding agent can therefore spend several minutes on a run it was never going to be allowed to finish.

Claude Code can be told to refuse those commands up front with a PreToolUse hook. This is a per-project thing rather than something the package ships, both because it depends on your task names and because a hook that can stop a developer running tests should be something you opted into deliberately. Adapt and save as .claude/hooks/playwright-mutex-gate.sh:

#!/usr/bin/env bash
# Refuse to start a Playwright run while another one holds the mutex.
#
# Everything here fails open. A hook that cannot reach Docker must not be able
# to stop someone running their tests; the worst case is the mutex itself
# refusing the run a few minutes later, which is what would have happened
# without the hook at all.
set -uo pipefail

input=$(cat)

command -v jq >/dev/null 2>&1 || exit 0
command -v docker >/dev/null 2>&1 || exit 0

[ "$(jq -r '.tool_name // empty' <<<"$input" 2>/dev/null)" = "Bash" ] || exit 0
cmd=$(jq -r '.tool_input.command // empty' <<<"$input" 2>/dev/null)
[ -n "$cmd" ] || exit 0

# An escape hatch, and the commands worth gating. Anything else -- reading a
# report, listing snapshots, editing a spec -- is untouched.
case "$cmd" in
  *"#no-playwright-mutex"*) exit 0 ;;
  *"playwright test"* | *playwright:run* | *playwright:visualdiff* | \
  *playwright:regenerate* | *playwright:install*) ;;
  *) exit 0 ;;
esac

# The volume's host path under /var/lib/docker is root-only, so probe through
# any running DDEV web container -- they all mount the same volume.
container=$(docker ps --filter 'label=com.ddev.site-name' --filter 'status=running' \
  --format '{{.Names}}' 2>/dev/null | grep -E -- '-web$' | head -n 1)
[ -n "$container" ] || exit 0

# Exit 3 means held. `flock -n` releases immediately when it succeeds, so
# probing never blocks a real run.
holder=$(timeout 15 docker exec "$container" sh -c '
  dir=/mnt/ddev-global-cache/playwright
  [ -e "$dir/mutex.lock" ] || exit 0
  flock -n "$dir/mutex.lock" true && exit 0
  cat "$dir/mutex.holder" 2>/dev/null
  exit 3
' 2>/dev/null)
[ "$?" -eq 3 ] || exit 0

project=$(sed -n 's/^project=//p' <<<"$holder" | head -n 1)

reason="A Playwright run is already in progress on this machine${project:+ (project $project)}.

Playwright runs with cpus-2 workers, so it already uses nearly the whole
machine. A second suite would make both runs slower than running them one
after the other, and CPU starvation shows up as visual comparison failures
that look like real regressions.

Do not run it now, and do not poll in a tight loop. Get on with other work and
try again in a few minutes; a full suite takes anywhere from 5 to 30 minutes."

jq -n --arg reason "$reason" '{
  hookSpecificOutput: {
    hookEventName: "PreToolUse",
    permissionDecision: "deny",
    permissionDecisionReason: $reason
  }
}'
exit 0

Register it in .claude/settings.json:

{
  "hooks": {
    "PreToolUse": [
      {
        "matcher": "Bash",
        "hooks": [
          {
            "type": "command",
            "command": "\"$CLAUDE_PROJECT_DIR\"/.claude/hooks/playwright-mutex-gate.sh"
          }
        ]
      }
    ]
  }
}

Two things to know about it. Claude Code reads .claude/settings.json at startup, so the hook only applies to sessions started after it is on disk — a session that was already running when you added it will still reach the mutex instead, which is the designed fallback rather than a failure. And ddev playwright test, from the ddev-playwright add-on, does not take the lock: the hook will refuse it while somebody else is running, but a run started that way holds nothing, and other runs will start on top of it. Prefer ddev task playwright:run.