LSM Stability Roadmap

Six Phases to Project Excellence

01

Local Development

Establish a robust local development environment using containerized tools for consistent, reproducible builds across the team.

Local Development - Syd Mead inspired concept art showing a personal development workstation pod with DDEV containers and Drainpipe conduits
View Full Documentation →
02

Tugboat

Deploy preview environments for every pull request, enabling visual review and stakeholder feedback before code merges.

Tugboat - Syd Mead inspired concept art showing floating preview environment spheres with a tugboat control craft
View Full Documentation →
03

Automated Testing

Implement comprehensive test coverage with end-to-end testing, error monitoring, and automated quality gates.

Automated Testing - Syd Mead inspired concept art showing robotic scanner arrays performing automated quality inspections
View Full Documentation →
04

Stabilization

Address technical debt, resolve critical issues, and optimize system performance for long-term maintainability.

Stabilization - Syd Mead inspired concept art showing a massive gyroscopic stabilizer core with tech debt resolution bays
View Full Documentation →
05

Automated Updates

Configure Renovate for automated dependency management, keeping the project secure and up-to-date with minimal manual intervention.

Automated Updates - Syd Mead inspired concept art showing a Renovate control tower with flowing package distribution tubes
View Full Documentation →
06

Scripted Deployments

View Full Documentation →